Advertisement

columbia solar project

Seamon: Gov’t Should Serve the People

I’m running for Town of Columbia supervisor because residents are looking for new leadership, and I’m prepared and committed to deliver that. It is simply time for a change—with new energy, new ideas, new openness, and new personnel.…

//

Seamon: Survey Shows Project To Be Very Unpopular

Letter from Nathan Seamon Survey Shows ProjectTo Be Very Unpopular The Town of Columbia survey results for the proposed Columbia Solar Project and Battery Storage Facility conducted by mail in March and April are in and have been tabulated. At the request of the Columbia Town Board, the survey was conducted by the Columbia Planning Board to better understand the opinions of the residents and property owners about the proposed solar project that developer EDF Renewables has been pitching in…

//

A Partial Observer: Town of Columbia Residents Wary of Project

A Partial Observer Town of Columbia Residents Wary of Project The Town of Columbia is being pitched a 350 megawatt solar and 20 MW battery storage project by French owned, and San Diego based EDF Renewables. The project outreach to local landowners began quietly in 2019 and will require approximately 2,200 usable, contiguous acres—equal to 10 percent of the land in the Town of Columbia, which is known to have some of the most fertile farmland in the state. The…